APC White Logo

APC Completes Landmark Project at Lillydale Airport

Feb 10, 2024Airport, Commercial Property, General

Completed tarmac surface at a small airport with aircraft in the distance.

APC has successfully completed a major project at Lillydale Airport, delivering advanced permeable concrete solutions tailored to the unique demands of aviation infrastructure. This project highlights APC’s expertise in creating durable, high-performance surfaces that enhance safety and efficiency in critical environments.

APC can help with your next large project

Find out more

N

Completed construction of runways, taxiways and other areas.

N

Utilised Ultracon technology for superior strength and water management.

N

Enhanced safety through custom-engineered surfaces.

N

Reduced maintenance needs with durable, low-maintenance materials.

N

Improved airport efficiency by minimising water pooling.

Elevating aviation infrastructure with durable, high-performance concrete solutions.

Airport Runway Landscape

Project Considerations Before Specification

Before installing a Permeable Footpath, site conditions should be assessed to confirm suitability and expected performance outcomes. This helps ensure the system is matched correctly to environmental and structural requirements.

Key considerations include:

  • Soil type and infiltration capacity
  • Local rainfall intensity and storm patterns
  • Sub-base design and drainage planning
  • Expected pedestrian and service load conditions
  • Surrounding infrastructure constraints

Next Steps: Planning To Specification

A Permeable Footpath provides a practical approach to managing stormwater while supporting durable, functional urban surfaces. It is suited to councils, developers, architects, and contractors working on infrastructure, public realm upgrades, and new urban developments.

To progress a project, technical support and specification guidance are available. Enquire or request a quote.