Wa-Karroong
Wathaurong Aboriginal Co-operative in Geelong has a new home. Wa-Karroong began as a conversation and got built by many hands, APC's among them.
For schools and clubs that need a court ready to play as soon as the rain clears.
A few quick questions about your site. You get a straight answer about whether permeable concrete is the right call, including when it isn't, before anyone asks for your details.
A wet court can cost a school its PE lesson, and for a club it often means the Tuesday training night is cancelled instead. On a sealed slab, rain has to travel sideways to a grate before the surface dries, and until it gets there somebody's out with a squeegee or everyone's waiting under the verandah.
Permcon doesn't hold the water. We pour the slab with 20 to 25 per cent voids, and rain drops through them at 8,000 to 10,000 mm/hr into the stone base under the court. The key stays clear of puddles, because the water goes down instead of across the lines.
The court is a 25+ MPa slab with a P4 slip rating.
Multi-code courts start on paper. We set the layout out with you before the pour, so the posts and run-off zones sit where every code you play needs them. The stone in the mix is 7 mm in Victoria and 10 mm in other states, and that's what gives the surface its open texture.
A new court on school or club land often comes with a council drainage condition. Poured permeable, it counts toward the site's permeable area where the council accepts it, and the base underneath is storage as well. It holds 28 litres a square metre for every 100 mm of clean screenings at 85 per cent design capacity. Heavy clay is slower. There we add an under-drain that lets the water out bit by bit. Give your engineer our technical data and we'll size the base to the condition.
Once a month, check that the court drains after rain and clear leaves and clippings before they settle into the surface. Sweep or hose it when it needs it. Once a year it gets a full sweep and a look for moss in the voids.
Our residential paths and driveways cover the rest of the house.
Yes. It's the same concrete we pour under driveways and car parks, so a ute or a mower is ordinary traffic. If a truck needs to cross to reach the oval, tell us at the site visit and we'll pour that strip thicker.
One crew places 500 m² a day. Give us your term dates or fixture list at the first visit and we'll plan the pour around them.
Where the ground takes water, the base holds a storm and lets it soak away, with no pipe to the street. On tight soil, or where council wants a controlled outflow, the under-drain described above runs to the stormwater connection. We work out which on the site visit.
A 10-year structural warranty, terms and conditions applying. If the slab fails structurally, we assess it on site and replace that section. Looked after on the monthly and yearly routine, it has a design life in excess of 30 years.
Usually, yes. Water drops through the permeable concrete at 8,000 to 10,000 mm/hr into the base underneath, which means nobody's out there with a squeegee and no run-off is sheeting across the court to a drain at the edge.
We have a standard detail for synthetic turf laid over 100 mm of Permcon, so turf is an option; so are modular tiles. Or play on the slab itself: plain grey, charcoal, soapstone or sandstone, P4 slip rating. Anything that seals the surface stops rain getting through it, so tell us at design stage rather than rolling it on later.
They can, along with futsal and volleyball. Getting it right is a job for before the pour: the cross-coded layout is set out first, with the posts placed to suit.
No. The sleeves are cast in as the slab is poured, and the net and hoop posts drop into them once it's cured. The slab stays whole around every footing, and each post sits exactly where the line marking expects.
It does. A home court gets the same 25+ MPa Permcon and the same designed base as a school or council court. We will work with anyone that wants the Permcon product; we just need to make a design that suits their needs. Because the court drains through itself, it can count toward your block's permeable area where council accepts it.
Permcon comes in plain grey, charcoal, soapstone and sandstone.
The slab also makes a drained base for synthetic turf or a sports surface laid to its maker's specification. Rain passes through the top layer and the concrete together. There's more court work in our news and on our projects page. Pick the top surface before we pour. The base underneath is designed around whichever surface goes on top.


Wathaurong Aboriginal Co-operative in Geelong has a new home. Wa-Karroong began as a conversation and got built by many hands, APC's among them.

A council job in Warwick: light-coloured Ultracon poured around an Early Learning Centre's existing cubby houses, sandstone blocks and garden beds to make a permeable play area.

A grey Permcon driveway runs up to a brown garage door, with a mulched garden bed and timber posts along the side.

Ferns and red-leaved planting mark the bend where this dark grey Ultracon driveway curves past shared garages, its edges softened by garden beds.

Wheel stops in yellow and black, bays marked in white, a wide aisle: a dark grey Ultracon permeable car park for housing units in front of black-and-white-clad townhouses.

Split down the middle by a black timber fence, two plain grey permeable parking pads front a contemporary home and finish at garden beds on each side.
Our own crews pour every Permcon court, with teams in every state. Tell us which codes you play and when you need it finished, and we'll come out and look at the site.